1. Resource Center
  2. Case Studies
  3. Permanent Electrical Safety Devices - GracePESDs®

Safe-Test Point™ - Case Studies

Manufacturing Industry

Routine preventative maintenance is one of the most time-consuming tasks in a manufacturing plant with 1.25 million square feet within five buildings. Installing Permanent Electrical Safety Devices (PESDs) decreased a high-volume LOTO process from 20 - 30 minutes to 5 - 10 minutes. Read about the solution in the Case Study: Window Treatment Manufacturing Plant.