Manufacturing

 

Case Study: Window Treatment Manufacturing Plant

Routine preventative maintenance is one of the most time-consuming tasks in a manufacturing plant with 1.25 million square feet within five buildings. Installing Permanent Electrical Safety Devices (PESDs) decreased a high-volume LOTO process from 20 - 30 minutes to 5 - 10 minutes.