Q: What precautions should I take when installing the fiber temperature probes in my equipment?

A: De-energize the equipment while following your facility’s electrical safety procedure. Securely mount the fiber probe assemblies to each monitoring point. Allow a bend radius of 0.5”or greater when routing the fiber; maintain separation between each phase conductors, avoid sharp edges and rough surfaces. See the HSM Installation Guide for detailed instructions.