An electrician is standing in front of a locked-out panel on a conveyor system. The isolator switch is off, the permit is signed, but before any mechanical work can begin, there’s one last step: verifying the absence of voltage.
Without a test point installed, this requires full personal protective equipment (PPE), a second qualified person as standby, and manually opening the panel to test with a multimeter. The Live-Dead-Live process drags on. Downtime racks up.
Now imagine the same task done safely, thru-door, in minutes, with no extra PPE, no second person, and no exposed conductors. That’s the impact of high-impedance test point Permanent Electrical Safety Devices (PESDs) installed on both the line and load sides.
The Live-Dead-Live test, outlined in NFPA 70E 120.6(7), is a critical verification step in Lockout/Tagout (LOTO) procedures. It ensures your voltmeter is working and confirms the equipment is truly de-energized before work begins.
The steps:
But what qualifies as a “known voltage source”? And how do you safely access both line and load sides without opening enclosures? That’s where PESDs come in.
GracePESDs®, including ChekVolt® and Safe-Test Point™, offer high-impedance, touch-safe test points that can be installed externally through the enclosure door. When installed on both line and load sides of equipment such as isolator switches or MCC buckets, they allow a qualified person to:
It’s safer, faster, and reduces the risk of skipped steps.
A leading global e-commerce and logistics company adopted this exact configuration across its fulfillment centers. By using ChekVolt test points on both sides of isolator switches:
Compliance with NFPA 70E wasn’t the side benefit—it was the driving force. Speed and labor savings followed naturally.
Performing LOTO without PESDs is like using a flashlight instead of floodlights—you’re still doing the job, but it’s slower, harder, and riskier. Installing high-impedance test points on both the line and load side lights the way toward better safety and easier compliance. Every panel is a new opportunity to make the safe choice the easiest one.
Ready to take your panel safety to the next level? Watch our on-demand webinar, Designing Safer Panels with Purpose, featuring former UL Principal Engineer John Kovacik. You’ll learn how to integrate UL-listed components and PESDs to simplify LOTO, reduce risk, and design with safety and compliance in mind—from UL 508A to NFPA 70E. Whether you’re building new panels or improving existing ones, this session is packed with practical insights from one of the experts who helped shape the standards.
Next week, we’re unpacking five condition-monitoring pitfalls in a live webinar: “Stop the Surprise Shutdowns: 5 Condition-Monitoring Mistakes to Fix in 2025”. Join our reliability pros for a deeper dive, real-time Q&A, and a practical pilot roadmap.
Save your seat here ➜ Webinar Registration
Stay SAFE, and have a GREAT week!